July was a short 3 day trip. We went back in August for a whole week! Our container has arrived and the house is full of stuff. There is still quite a bit of work going on in the interior so most of the unpacking will have to wait until our next visit. At least the electricians and plumbers can go to town, they have been waiting for the goods in this container.

August 17, 2010

The driveway in completed and the retaining wall is plastered and looking much nicer.

         

The bronze railings and entrance gate have been installed and look sweet!

        

August 18, 2010

Can’t wait till there are some steaks sizzilin on that grill!

And some water spitting out of Neptune’s mouth.

 

August 20, 2010

Such peaceful views…

               

 

The iridescent glass tile has been installed in the swimming pool. Plaster soon come.

Break time at The Tourist Trap. I’ll have a “Drink Right, Keep Left” please – make that two.

          

August 21, 2010

The long shot is really looking good now that the retaining walls are plastered.